Projects
A project groups one data model with its rows, assets, collaborators, and visualizations. Create separate projects when data sets need different schemas or access rules.
Create a project
From a workspace, open Projects and choose the create action. Give the project clear short and long names. You can build it manually or use an available generation workflow, then review the result before relying on it.
Project structure
The project navigation separates the main areas:
- Overview for project identity and summary.
- Data for columns, rows, and series.
- Basic and combined assets for reusable presentation elements.
- Visualizations for the published output.
- Collaborators for project-specific access where supported.
Build the column schema before adding many rows. Assets belong to the project and can be reused by its visualizations.
Collaboration and lifecycle
Workspace membership does not automatically guarantee the same access to every project. Review project collaborators before sharing sensitive work. Rename or update projects from their available settings; confirm destructive actions carefully because removing a project can also remove dependent data and visualizations.
Continue with data, then create a visualization.